February 24, 2023 – Bruce Heights sends demand letter to Bruce Lake Development, LLC

RE: REQUEST FOR RESPONSE

Bruce Heights Community has evidence to show you are in breach of Easement Agreement and Covenants on Bruce Lake filed with Greenville County dated March 15, 1989.

We have evidence demonstrating the purposeful destruction of the lake infrastructure without intention to restore that infrastructure or the integrity of Bruce Lake. Specifically, the permanent brick spillway infrastructure was methodically destroyed over the course of many days beginning on or about September 28, 2022 by Andre Giauque who identified himself as a representative of Larry and Steve McNair and acting on behalf of Bruce Lake Development, LLC.

We have evidence demonstrating a breach of rules and obligations pertaining to your intentions to conduct a commercial enterprise on Bruce Lake. Specifically, a Development Plan called “Bruce Lake – Name of Planned Development” dated December 1, 2021 and filed with Greenville County on behalf of Bruce Lake Development, LLC.

Letter: 24-FEB-2023Please provide written response in regard to your intention to do the following in accordance with the Easement Agreement and Covenants on Bruce Lake dated 1989:

  1. Repair Bruce Lake spillway

SPILLWAY, EARTHEN DAM MUST BE MAINTAINED:
Specifically, maintenance of proper physical structures are required in that “The purchaser shall provide a safe and adequate dam, a spillway and an adequate head gate valve for the purpose of draining or lowering the lake. This head gate valve shall meet reasonable engineering requirements and standards.”

  1. Restore water levels in Bruce Lake

NO PERMANENT FLUCTUATIONS IN THE WATER LEVELS:
Specifically, the water levels were reduced to levels against Covenant-permitted watermarks allowed on Bruce Lake and have not been restored for at least 150 days. Specifically, maintenance of proper physical structures are required in a way that prohibits fluctuations in the water level, whereby the “easement shall not extend to such drainage or flooding as may be the proximate result of any negligent act or emission of either party hereto; and provided further, the flooding easement shall be limited to the right to flood to the present high water mark of the lake as shown upon the survey to be made of the property …. The permitted activities of Purchaser … shall not result in any permanent substantial decrease in the level of the lake below its normal pool over” 

  1. Refrain from all commercial activity

NO COMMERCIAL ACTIVITY:
Specifically, the nature of activity is limited on and around Bruce Lake, “it being the intent of the parties that the lake shall remain at all times a private lake with no commercial activity allowed.”

  • Refrain from using Bruce Lake as a detention pond 

NO ACTIONS RESULTING IN THE LAKE BEING MADE A HAZARD OR NUISANCE:
Specifically, your Development Plan dated December 1, 2021 indicates a willingness to discharge stormwater into Bruce Lake and destroy natural riparian buffers. The designation within this reciprocal agreement does not permit “anything to be done which would tend to make the lake a hazard or nuisance or conduct any activity which shall be a nuisance or put or deposit debris, trash, noxious or other objectionable materials into the lake.” 

 

Alongside these specifically worded obligations in the covenant, you have also been subject to various duties that are legally implied into your engagement, including the duties of fidelity (loyalty), acting in good faith, maintaining honesty and loyal service and the mutual obligation of behaving in a manner that upholds trust and confidence.

Given everything set out above, please immediately provide us with a signed written statement confirming a set date to comply with the above mentioned issues.

This statement should be addressed to Bruce Heights Community within 30 days. If you are in any doubt as to your obligations, please reply with your reasoning.

I must emphasise that, in the event you fail to comply with what has been set out above and you continue to act in breach of any of your obligations to us, we fully and expressly reserve the right to take appropriate legal action against you.

This action may include making an immediate application to a court for appropriate court orders, such as an application for an injunction to force you to comply, if necessary, as well as compensation for any losses that suffers, the costs of which will be borne by you.

We very much hope that involving the courts will not be necessary and that you will comply with your obligations accordingly. Please ensure you send us your written statement immediately.

Yours sincerely,

Bruce Heights Community Representative